The getting-started and contributor docs had drifted from what the workflows and the
code actually do:
- quick-start and CONTRIBUTING pointed users at a `latest-jvm` image that the release
pipeline never publishes; both now name the `-compat` image, and `make docs-check`
greps the docs for any `-jvm` tag
- the CONTRIBUTING branching model now matches the workflows: `main` is published as
the nightly channel, a maintainer runs the Release Cut workflow to tag a release, and
the tag triggers the publish; PR builds produce compat images but never publish them
- README and the docs landing page carried a hand-maintained service count and a
second copy of the service table, both stale; they now link to the Services Overview
- the Service Matrix gains the ELB Classic row it was missing, with an `elb` alias so
the check no longer resolves the Classic key to the v2 page, and
check_service_matrix.py now also fails on a docs/services page that has no row
- the README category table lists 16 documented services it omitted
- mkdocs nav gains 11 service pages that were unreachable from the site, drops a
duplicate CloudTrail entry, and the docs job now runs `mkdocs build --strict` with nav
and link validation so a page without a nav entry fails CI
- AGENTS.md, CONTRIBUTING.md and docs/contributing.md told contributors to register a
service in ServiceRegistry, which has no registration API; all three now point at
ResolvedServiceCatalog and list the config, storage, native-image, docs, tooling and
compat-suite touchpoints a new service needs
* docs: state the release cadence in CONTRIBUTING and the docs site
Follow-up to the release-train documentation. CONTRIBUTING described how a
release is cut but never when, and the published contributing page said
nothing about releases at all, so the cadence was only discoverable from the
README.
- CONTRIBUTING: the 1st and 3rd Tuesday train leads the release section, and
merging to main is stated not to cut a release.
- docs/contributing.md: a Releases section, including why the commit type
matters, since semantic-release derives the version from it.
- docs/configuration/docker-images.md: the Channel table said release images
publish "on every release", which explained nothing; it now names the train.
Three corrections in the same table, all pre-existing:
- The nightly row said 22:00 CT. nightly.yml is cron '0 23 * * *' pinned to
America/Chicago, and observed runs land at 04:0x UTC, so it is 23:00 CT.
- Dated nightly tags were described as fixed and never moving. The workflow
accepts workflow_dispatch and pushes unconditionally, so a same-day rerun
republishes that day's tag. Reproducibility is a release-tag property.
- The pinned example was 1.5.11, six minor versions behind.
Em-dashes in the touched files replaced with ordinary punctuation, per the
documentation style rule in AGENTS.md.
* docs: correct three points raised in review
- Nightly availability was overstated. A merge after the nightly workflow
starts misses that run, so the text no longer promises "that night's"
image; it says the change reaches nightly on the next nightly build.
- The published contributing page called CHANGELOG.md never hand-edited,
omitting the changelog-edit label that the root CONTRIBUTING documents as
the route for a genuine correction.
- docker-images.md recommended 1.7.0 in the channel table while its Quick
Reference still pinned 1.5.11.
Each was fixed in all four emulators, not only where it was flagged.
The review backlog is long enough that a single contributor holding many
open PRs makes it harder for any of them to get proper attention. This
adds a nudge rather than a gate.
On open or reopen, a workflow counts the author's open PRs and, above
five, adds an `over-pr-limit` label and posts one comment linking their
open PRs. It never closes a PR and never fails a check, both paths exit
zero. Bots and maintainers are exempt, so dependabot can hold as many as
it needs. The comment is posted at most once per PR via a marker, and the
label is removed automatically when the author drops back under the
limit.
`pull_request_target` is used so the token can label fork PRs. The
workflow never checks out or runs PR code, it only calls the GitHub API,
so the elevated context is not exposed to untrusted input.
The policy is documented in CONTRIBUTING.md and docs/contributing.md.
Also drops the CONTRIBUTING.md edge-builds section, which described the
`edge.yml` workflow removed in #691 and was the last reference to it, and
fixes a stray character in the adjacent CI line.
First-time contributors' pull requests sit with no CI at all until a maintainer
approves the workflow runs, and nothing on the PR explains the wait — recent
ones went 10 to 12 days before anyone noticed they had never been tested.
The Slack invite was reachable only from the bottom of the README (line 785 of
834). It appeared in neither CONTRIBUTING file, the pull request template, nor
either issue template, so contributors arriving through those paths never saw
it.
Add a first-interaction workflow that greets a contributor's first issue or
pull request; the pull request message leads with why the checks have not
started, so the gate reads as routine rather than as neglect. Surface the Slack
invite where contributors actually pass: the new-issue chooser via
contact_links, the pull request template, and both CONTRIBUTING files.
The workflow only posts a comment and never checks out or executes pull request
code, so its pull_request_target trigger does not expose the elevated context.
* docs: migrate docs GitHub references to floci-io
* docs: update MkDocs site and repo metadata to floci-io
* docs: update MkDocs site_url and repository references to floci-io