mirror of
https://github.com/floci-io/floci.git
synced 2026-11-22 21:50:46 -05:00
* ci: run the per-PR hygiene checks in one job The signed commits, AI attribution, Conventional Commits, em-dash and PR template checks were five workflows with one job each, so every push to a pull request started five runners for about ten seconds of work apiece. At busy times those jobs queued for up to twenty minutes behind the CI shards and the compatibility suites under the account's concurrent-job limit. They now run as steps of a single "PR hygiene" job. Each step keeps the old check's name, script and annotations, and runs under !cancelled() so one failure does not hide the others. The signature check also runs on "edited" now: with one job, an edit-triggered run replaces the whole result, and skipping signatures there would turn an unsigned PR green. A per-PR concurrency group cancels superseded runs. The path-filtered checks (docs tables, partition literals, changelog guard) keep their own workflows. * ci: skip draft PRs with a job condition instead of a gate job CI and Compatibility Tests reached the draft rule through a reusable workflow that started its own job on every run. That job did about three seconds of work, but every other job in the run needed it, so under the account's concurrent-job limit its queue wait sat at the head of the critical path: on recent PR runs a median of about 35 seconds, and nine to thirteen minutes at the tail, before a shard or native build could even be queued. The same condition now sits on the root jobs as a job-level if:, which GitHub evaluates without a runner. Drafts, closed PRs and edited events still skip the suites and pushes to main still run; the native suites follow build-native. CI summary keeps always() so a failed shard still reaches the partition check and report, and uses the same condition so it does not run on a draft. pr-draft-gate.yml has no callers left and is removed.