The job's IAM request-resources check now takes about four and a half
minutes on its own, so the job as a whole runs right at its five-minute
limit and is cancelled whenever a runner is a little slow. Main's own
push run of it was cancelled that way on 2026-11-14, as were the PR runs
on several branches the same day, each of which passed on a re-run.
Every check that finished before the cut matched; nothing had drifted.